Our Artemis I mega Moon rocket is rolled to the launch pad …
The astronauts of our Crew-2 mission come to Washington ….
And investigating the impression of mud on our local weather … a number of of the tales to let you know about – This Week at NASA!
Artemis I Moon Rocket Rolled to Launch Pad Ahead of Tanking Test
On June 6, groups at our Kennedy Space Center rolled our Space Launch System rocket, Orion spacecraft, and cell launcher from the Vehicle Assembly Building to launch pad 39B to arrange for the following moist gown rehearsal check try forward of the uncrewed Artemis I flight check. The moist gown rehearsal check is at the moment focused for no sooner than June 19.
Crew-2 Astronauts Make Post-Flight Visit to D.C. Area
Our SpaceX Crew-2 astronauts – NASA’s Shane Kimbrough and Megan McArthur, Akihiko Hoshide of the Japan Aerospace Exploration Agency, and the European Space Agency’s Thomas Pesquet – visited the Washington, D.C. space through the week of June 6 to share experiences from their current flight to the International Space Station. During a cease at our Mary W. Jackson NASA Headquarters constructing, they met with NASA management and mentioned their mission with workers. They additionally attended an occasion hosted by the Ambassador of France to the United States throughout which the French area company, CNES, grew to become the 20th nation to signal the Artemis Accords. The Crew-2 astronauts and their Crew Dragon Endeavour spacecraft spent 199 days in orbit – a document for the longest spaceflight by a U.S. crewed spacecraft.
Space Station Climate Study on Next SpaceX Cargo Mission
The Earth Surface Mineral Dust Source Investigation or EMIT is one of the primary payloads scheduled for delivery to the International Space Station on the SpaceX CRS-25 cargo mission. The investigation will use NASA-invented imaging technology to identify the composition of mineral dust from Earth’s arid regions and analyze dust carried through the atmosphere from deserts to see what effects it has on the Earth system and to human populations. The CRS-25 cargo mission is currently targeted to launch no earlier than June 28.
Europa Clipper Mission Completes Main Body of the Spacecraft
The main body of our Europa Clipper spacecraft was delivered recently to our Jet Propulsion Laboratory in Southern California. Engineers and technicians there will finish assembling the spacecraft by hand, then test it to make sure it can withstand the journey to Jupiter’s icy moon Europa. Targeted for launch in October 2024, the mission will make nearly 50 flybys of the Jovian moon, which is believed to have an underground ocean that contains twice as much water as all oceans on Earth combined. The ocean on Europa may also currently have conditions suitable for supporting life.
Ames Debuts Life-Size VIPER Moon Rover Model for Visitors
Our Ames Research Center recently unveiled a life-size display model of the agency’s VIPER Moon rover for visitors at the Chabot Space and Science Center. VIPER, which is managed by Ames and is part of our Artemis program, will be delivered to the Moon’s South Pole in late 2023 to map and explore the region for water and other resources ahead of future human missions to the lunar surface.
That’s what’s up this week @NASA …